Pine Street Reconstruction

 

Project Location:  Pine Street from Cherry St to Dodge St

 

Project Budget:  $538,000 ($490,000 CDBG funds)

                               

Project Schedule:

                Design Start Date               April 2011     

                Construction Start Date     August 2013            

                Project Finish                      December 2013  – Phase 1 (Cherry St to Harris St)

                                                                November 2014 – Phase 2 (Harris St to Dodge St)  

 

 

 

The proposed project

includes full depth

reconstruction of Pine Street

from Cherry Street to

Dodge Street.

 

The length of work is approx-

imately 885 feet and the width

of Pine Street will be 26 feet

between face of curb.

 

 

Concrete curb and gutter will be provided with new catch  basins and new storm sewers to improve drainage along the roadway. The new storm sewer will tie into an existing 24” storm sewer on Harris Street and an existing 24” storm sewer on  Dodge  Street which outlets to  the west. The storm sewer outlet was recently improved with CDBG funds in 2008. An existing 6” water line will be replaced with an 8” line between Harris Street and Dodge Street. The city will coordinate with the EPA for approval of the water line as needed and to obtain a permit to install. Driveway aprons will be rebuilt with concrete and concrete sidewalks will be provided on both sides of the road to tie into existing sidewalks on Cherry Street, Harris Street and Dodge Street. Lawn areas will be graded and seeded and street trees will be added along the roadway.

The project will be designed for construction in two phases. Phase 1 will be from Cherry Street to Harris Street and Phase 2 will be from Harris Street to Dodge Street. Phase 1 is planned for construction in 2013 and Phase 2 in 2014. The project schedule is to have Phase 1 advertised for bidding in May 2013.

 

 Project Status:
  • Finishing Phase 1 plans
  • Advertise for contractor bids in June