Project Location:
Spaulding Drive Bridge over Fish Creek
Project Budget: $648,000
Project Schedule:
Design Start Date March 2008
Construction Start Date April 2009
Project Finish October 2009
Spaulding Drive Bridge
Bridges are rated from 0 to 9 relative to their condition and public safety
risk.
In 2006, the Spaulding Drive Bridge was rated a 3, qualifying it for
replacement using Municipal Bridge Program funds obtained from the Ohio
Department of Transportation.
The Spaulding Drive Bridge Replacement project involves the design and
construction of a new structure to replace the existing bridge along with
minimal road work.
The total project length (including bridge) is 350 feet.

Project administered by the City of Kent in conjunction with
the Ohio Department of Transportation
Project Status:
|