Middlebury Road Watermain
Project Location:
Middlebury Road
Project Budget: $550,000
Project Schedule:
Design Start Date
April 2009
Construction Start Date Fall 2012
Project Finish
2013
The City of Kent Service Department has recorded 17 total waterline breaks along
the existing Middlebury Road watermain since the year 2000. Recently, there has
been an increase in frequency of breaks. The City’s Central Maintenance
Department has been responding to the breaks.
Approximately
3,500 feet of water main replacement is proposed. This project will tie into
the new Middlebury/Cherry water main and continue northeast along Middlebury
Road, terminating with a connection into the Longmere Drive watermain. The new
8 inch ductile iron pipe will be wrapped in plastic to protect it from corrosive
soils.
The existing
Middlebury Road waterline is an 8-inch cast iron pipe constructed in the year
1960.

WATERMAIN BREAK LOCATION\
Project
Status:
-
Preliminary design plans and specifications
have been submitted to the City for review
-
OPWC
funding has been awarded
-
Project
will be advertised spring 2012.
-
Construction will begin fall 2012
|
Contact:
Cori Finney, P.E.
Senior Engineer
Phone:
330-678-8106
Email:
finneyc@kent-ohio.org |
 |
City of Kent
Department of Public Service
Division of Engineering |
|